Location: Merritt, BC Merritt Green Energy Project (Boiler Building)


Scope of Work

  • Complete erection of the Structural Steel including stair cases, ladders, handrail, etc.
  • Installation of the following structures:
    • Ducting: Over Fire Air, Under Grate Air, Distribution Air and Flue Gas
    • Fuel Feed Systems (biomass feeding style)Motors (mechanical alignment included)
    • Installation of the Fire Protection System
  • Supplied confined space attendances
  • Supplied confined space and high angle rescue
  • Industrial painting
  • Supplied crane and equipment operators


Additional Information

Prime Quality Construction Inc. was awarded the contract for the above work for the 40 MW Biomass Power Plant in Merritt, BC.